Your suggestion was sent to the NJCO team. We appreciate you helping us improve the Budget App.
It tracks your project budget against actual spending — by trade / cost line — so owners and the site team can see what is planned, committed and spent, and what is left. Think of it as the live money board for the build. It is a planning and tracking tool, not a quotation, contract, or bill.
Estimate builds a preliminary cost from your house inputs (or plans). Budget tracks that cost while you build — estimate vs committed vs actual by trade. Separate login; Budget is a tracking tool, not a contract or official billing.
Yes on Plus and Pro: download the BOQ (CSV) from the Estimate App and import it. Each BOQ subgroup becomes a budget line. On Basic, start blank and add cost cards. Need import? Contact NJCO.
No. Figures in the Budget App are for planning and monitoring only. Your signed NJCO proposal, construction contract, progress billings, and official receipts are the documents that count for payment and legal scope. Budget tool only; not a contract or official billing. The signed contract governs.
Not automatically. Import gives you the Estimate BOQ baseline. A signed contract or approved variation order may differ — update lines to match the signed scope, or ask NJCO to align them.
Yes on higher access levels: Owner view focuses on overall budget health; Contractor view emphasizes line-item tracking for field and cost control. NJCO sets your access when the account is created. Switch anytime from the top bar when available.
Enter or update actual costs when materials are delivered, labor is paid, or services are billed. Keep the board current as the site moves so % complete and spend stay aligned.
Your details are used only to run your budget account and to contact you about it, following the Data Privacy Act of 2012. We don’t sell or share them, and you can ask us to delete your account at any time.
A reserve on top of your cost lines for unknowns. Default: about 5% for a new build, about 10% for a renovation (you can set 3–15%). Drawing contingency needs a reason; it is not free spending and not a substitute for under-designing the structure.
About 2% of structural lines (foundation, columns, beams, slabs, rebar, etc.). It cushions structural unknowns and PE-directed adjustments during detailed design — not a separate PE design fee and not a guarantee that no further structural cost will appear. Structural and safety lines cannot be deleted or downgraded below safe specs — consult your engineer.
No — not without your structural engineer. Foundation, columns, beams, slabs and other structural / safety lines follow the signed plans. Cutting below the review threshold or changing specs needs engineer review and a proper variation order. Savings levers are finishes and fixtures, not structure.
Look first at finishes and fixtures (tiles, paint, doors, windows, ceilings, lighting, sanitary) and at scope you can defer. Keep structure, waterproofing, and life-safety items as designed. Use contingency or a signed variation order when the engineer or owner approves. Plus/Pro alert at about 90% and at 100%.
No. Budget figures are cost planning only. Member sizes, rebar, and foundations must still come from structural design (for example PortStruct for preliminary checks, then PE-signed calculations and drawings) before permit and construction.
Update the affected cost cards (or re-import a revised BOQ). Bigger scope changes need a refreshed estimate and, when structural, engineer approval — then reflect them here so budget vs actual stays honest. Any binding change to price or scope still needs the usual NJCO written process.
Only the cost lines you added or imported, plus contingency and structural risk as set. Owner-supplied / “by Client” items stay at no cost to the builder. Anything not listed is not in the budget. Defaults are before VAT unless you turn VAT on.
Defaults are before VAT. Building permits, HOA fees, soil investigation, furniture, appliances, and items marked owner-supplied are included only if you add them as lines — otherwise they are outside the Budget.
No. It’s a living budget for planning and tracking. The binding price is only a signed NJCO proposal or construction contract after site inspection and plan review.
No. It is a branded progress / tracking report for your records and discussions. Only a signed NJCO proposal or construction contract is binding.
Yes on Pro: the Schedule tab builds an indicative Gantt chart, S-curve and PERT/CPM from your budget cost lines plus manpower / supervision inputs (reverse of the Estimate App Premium idea). Working days are Monday–Saturday. It is for planning and monitoring only — not the contractual programme and not for progress billing. The signed contract, PE-certified accomplishment and NJCO billing statements govern. Basic and Plus: Contact NJCO about Pro. No prices are listed in the app.
Basic tracks costs on fewer projects with simpler cards. Plus and Pro add Estimate BOQ import and over-budget alerts. Pro also adds contractor view, fuller reports, and an indicative Gantt + S-curve + PERT/CPM schedule from your lines and manpower. Levels and access are set by NJCO — Contact NJCO; prices are not listed in the app.
Budget App accounts are created by NJCO (CEO master account). Message us via www.njcomasterbuilders.com or email [email protected] with your name and project. Separate login from the Estimate App. There is no public self-signup.
No. Budget App accounts are separate from the NJCO Estimate App. Use the username and password NJCO issued for Budget.
Still have questions? Visit www.njcomasterbuilders.com.